The biggest AI data center we track is xAI (SpaceXAI)'s Colossus 2, at ~946 MW of current IT power per Epoch AI as of 15 Oct 2026. Below: every tracked site ranked, then planned capacity and capex where a lab discloses them. Compute is shown but not scored, because figures aren't comparable across labs.

Compute: comparable Epoch AI current IT power estimates
RankLabCurrent IT powerSiteAs ofSource
1xAI (SpaceXAI)~946 MWColossus 2, current IT power (est.), largest tracked15 Oct 2026Epoch AI (opens in new tab)
2Anthropic~910 MWAnthropic-Amazon New Carlisle, current IT power (est.)15 Oct 2026Epoch AI (opens in new tab)
3Meta Super­intelligence Labs~471 MWMeta Prometheus, current IT power (est.)15 Oct 2026Epoch AI (opens in new tab)

Each figure is an Epoch AI estimate as of the date shown; only this comparable subset (same source, same metric) is ranked.

Every other compute disclosure

Not ranked and not scored: capex guidance, contracted GW and spend forecasts use different methodologies per lab and aren't comparable across labs (see methodology).

Other compute disclosures
LabDisclosureValueAs ofSource
AnthropicCompute contracted since Oct 2025≥14.8 GW6 Sept 2026The Information via AI-RTZ (opens in new tab)
AnthropicFixed/minimum compute & infrastructure commitments~$265.6B30 Jun 2026Anthropic S-1, Note 13 (SEC EDGAR) (opens in new tab)
OpenAIPlanned capacity by 2030 (told investors)30 GW9 Sept 2026AI-RTZ (opens in new tab)
OpenAICompute spend forecast through 2030~$750B9 Sept 2026AI-RTZ (The Information) (opens in new tab)
Google DeepMindAlphabet 2026 capex guidance (company-wide)$195–205B22 Jul 2026CNBC (Q2 2026 earnings) (opens in new tab)
Meta Super­intelligence LabsMeta 2026 capex guidance (company-wide)$135–145B21 Oct 2026Meta Q3 2026 results (opens in new tab)
xAI (SpaceXAI)AI-segment capex, Q1 2026$7.7B31 Mar 2026TechCrunch (S-1) (opens in new tab)
Alibaba (Qwen)Group capex, June quarterUS$9.975B30 Jun 2026Alibaba June Quarter 2026 results (opens in new tab)

No compute disclosures gathered yet for Mistral AI, DeepSeek, Moonshot AI (Kimi), Z.ai (Zhipu).

FAQ

What is the biggest AI data center right now?

Of the sites we track, xAI (SpaceXAI)'s Colossus 2, at ~946 MW of current IT power per Epoch AI (opens in new tab), as of 15 Oct 2026.

Where does this number come from?

Epoch AI (opens in new tab)

Why isn't every lab listed?

OpenAI, Google DeepMind, Alibaba (Qwen) have no Epoch AI current-IT-power estimate on file; their other compute disclosures are listed below, not ranked. Mistral AI, DeepSeek, Moonshot AI (Kimi), Z.ai (Zhipu) have no compute disclosures on file.

How far ahead is it?

About 4% more estimated power than #2, Anthropic-Amazon New Carlisle (~910 MW). Computed by us from the two estimates.

What does "current IT power" mean?

The estimated electrical power available to the computing equipment at a site today, not the planned final capacity.